Design, Supply, Installation, Testing & Commissioning for the Smart Pumping Station at Kowloon City No.1 Sewage Pumping Stations for Drainage Services Department
Design, Supply, Installation, Testing & Commissioning for the Smart Pumping Station at Kowloon City No.1 Sewage Pumping Stations for Drainage Services Department
admin
0 Comments
Project period: 8/2019~12/2021
The Evolution of Control Systems with Artificial Intelligence, achieves the Smart Pumping as followings: – Server for modelling and set-point calculation. – Facilitate the communication between A.I. control system server and existing SCADA system – Program with energy saving control logic. – Data logging feature to record necessary operating data and set-points