Design, Supply, Installation, Testing & Commissioning for the Smart Pumping Station at Kowloon City No.1 Sewage Pumping Stations for Drainage Services Department

0 Comments

Project period: 8/2019~12/2021

The Evolution of Control Systems with Artificial Intelligence, achieves the Smart Pumping as followings:
– Server for modelling and set-point calculation.
– Facilitate the communication between A.I. control system server and existing SCADA system
– Program with energy saving control logic.
– Data logging feature to record necessary operating data and set-points